Skip to content

This website is under construction. Its content and links are provisional.

ES

A Makespan Minimization in an m-Stage Flow Shop Lot Streaming with Sequence Dependent Setup Times: MILP Model and Experimental Approach

Authors
Gómez-Gasquet, Pedro; Segura Andrés, Rubén; Franco Pereyra, Rubén D.; Andrés-Romano, Carlos
Year
2013
Type
Book chapter
Published in
Annals of Industrial Engineering 2012
Pages
217–224
Publisher
Springer London
DOI or link
10.1007/978-1-4471-5349-8_26

How to cite

APA 7 citation

Gómez-Gasquet, P., Segura Andrés, R., Franco Pereyra, R. D., & Andrés-Romano, C. (2013). A Makespan Minimization in an m-Stage Flow Shop Lot Streaming with Sequence Dependent Setup Times: MILP Model and Experimental Approach. In Annals of Industrial Engineering 2012 (pp. 217–224). Springer London. https://doi.org/10.1007/978-1-4471-5349-8_26

BibTeX

@incollection{romano2013a,
  title = {A Makespan Minimization in an m-Stage Flow Shop Lot Streaming with Sequence Dependent Setup Times: MILP Model and Experimental Approach},
  author = {Gómez-Gasquet, Pedro and Segura Andrés, Rubén and Franco Pereyra, Rubén D. and Andrés-Romano, Carlos},
  booktitle = {Annals of Industrial Engineering 2012},
  pages = {217--224},
  publisher = {Springer London},
  doi = {10.1007/978-1-4471-5349-8_26},
  year = {2013}
}

This record is provided by its authors (additional publications list of the group's website).