A Makespan Minimization in an m-Stage Flow Shop Lot Streaming with Sequence Dependent Setup Times: MILP Model and Experimental Approach
- Autores
- Año
- 2013
- Tipo
- Capítulo de libro
- Publicado en
- Annals of Industrial Engineering 2012
- Páginas
- 217–224
- Editorial
- Springer London
- DOI o enlace
- 10.1007/978-1-4471-5349-8_26
Cómo citar
Cita en formato APA 7
Gómez-Gasquet, P., Segura Andrés, R., Franco Pereyra, R. D., & Andrés-Romano, C. (2013). A Makespan Minimization in an m-Stage Flow Shop Lot Streaming with Sequence Dependent Setup Times: MILP Model and Experimental Approach. In Annals of Industrial Engineering 2012 (pp. 217–224). Springer London. https://doi.org/10.1007/978-1-4471-5349-8_26
BibTeX
@incollection{romano2013a,
title = {A Makespan Minimization in an m-Stage Flow Shop Lot Streaming with Sequence Dependent Setup Times: MILP Model and Experimental Approach},
author = {Gómez-Gasquet, Pedro and Segura Andrés, Rubén and Franco Pereyra, Rubén D. and Andrés-Romano, Carlos},
booktitle = {Annals of Industrial Engineering 2012},
pages = {217--224},
publisher = {Springer London},
doi = {10.1007/978-1-4471-5349-8_26},
year = {2013}
}
Esta ficha la aportan sus autores (lista de publicaciones adicionales de la web del grupo).