Skip to content

This website is under construction. Its content and links are provisional.

ES

Mid-term production planning systems. A case study of an engine assembler

Authors
García Sabater, José Pedro; Maheut, Julien Philippe; García Sabater, Julio Juan
Year
2009
Type
Conference presentation
Published in
XIII Congreso de Ingeniería de Organización/ 3RD International Conference on Industrial Engineeering and Industrial Management (Barcelona-Tarrasa, España. . 2009)
DOI or link
Not in the data

How to cite

APA 7 citation

García Sabater, J. P., Maheut, J. P., & García Sabater, J. J. (2009). Mid-term production planning systems. A case study of an engine assembler []. XIII Congreso de Ingeniería de Organización/ 3RD International Conference on Industrial Engineeering and Industrial Management (Barcelona-Tarrasa, España. . 2009).

BibTeX

@misc{sabater2009midterm,
  title = {Mid-term production planning systems. A case study of an engine assembler},
  author = {García Sabater, José Pedro and Maheut, Julien Philippe and García Sabater, Julio Juan},
  eventtitle = {XIII Congreso de Ingeniería de Organización/ 3RD International Conference on Industrial Engineeering and Industrial Management (Barcelona-Tarrasa, España. . 2009)},
  year = {2009}
}

This record is provided by its authors (additional publications list of the group's website).