The Fuzzy Project Scheduling Problem with Minimal Generalized Precedence Relations
- Autores
- Año
- 2015
- Revista
- Computer-Aided Civil and Infrastructure Engineering
- Volumen
- 30
- Número
- 11
- Páginas
- 872–891
- DOI o enlace
- No consta en los datos
Cómo citar
Cita en formato APA 7
Ponz-Tienda, J. L., Pellicer, E., Benlloch-Marco, J., & Andrés-Romano, C. (2015). The Fuzzy Project Scheduling Problem with Minimal Generalized Precedence Relations. Computer-Aided Civil and Infrastructure Engineering, 30(11), 872–891.
BibTeX
% Not in the source data: doi, abstract
@article{ponz-2015-fuzzy-project-scheduling,
author = {Ponz-Tienda, José Luis and Pellicer, Eugenio and Benlloch-Marco, Javier and Andrés-Romano, Carlos},
title = {{The Fuzzy Project Scheduling Problem with Minimal Generalized Precedence Relations}},
journal = {Computer-Aided Civil and Infrastructure Engineering},
year = {2015},
volume = {30},
number = {11},
pages = {872--891}
}
Esta ficha sale de la tabla de artículos de la web anterior del grupo (última actualización el 26 de marzo de 2024). Solo muestra lo que consta ahí: el DOI y el resumen no figuran en los datos.