A two-stage sequential planning scheme for integrated operations planning and scheduling system using MILP: the case of an engine assembler
- Autores
- Año
- 2012
- Revista
- International Journal of Flexible Manufacturing Systems
- Volumen
- 24
- Número
- 2
- Páginas
- 171–209
- DOI o enlace
- No consta en los datos
Cómo citar
Cita en formato APA 7
García Sabater, J. P., Maheut, J. P., & García Sabater, J. J. (2012). A two-stage sequential planning scheme for integrated operations planning and scheduling system using MILP: the case of an engine assembler. International Journal of Flexible Manufacturing Systems, 24(2), 171–209.
BibTeX
% Not in the source data: doi, abstract
@article{garcia-2012-stage-sequential-planning,
author = {García Sabater, José Pedro and Maheut, Julien Philippe and García Sabater, Julio Juan},
title = {{A two-stage sequential planning scheme for integrated operations planning and scheduling system using MILP: the case of an engine assembler}},
journal = {International Journal of Flexible Manufacturing Systems},
year = {2012},
volume = {24},
number = {2},
pages = {171--209}
}
Esta ficha sale de la tabla de artículos de la web anterior del grupo (última actualización el 26 de marzo de 2024). Solo muestra lo que consta ahí: el DOI y el resumen no figuran en los datos.